On the first day of survey, SKY MARINE team has diagnosed holes and cracks on the hull.
Inox and carpentry repair in both internal and external areas needed to be done.
On the other hand, there was seen an extreme damage of sea salt inside the tail and drive of the engines.
Our Volvo Penta Engineers and Mechanics cleaned the tail and fixed the drive, ordering spare parts where necessary.
December 1st 2010
On the lift, into the tent.
1st DAY
Into the Tent
1st Day Survey in the Tent
Decayed and Deformed Tail & Drive
Propeller Dispatch
Decayed Interior Parts.
Carpentry Work needed.
Crack Repair
Carpentry and Inox Work,
Crack Repair
Carpentry and Inox Work,
Crack Repair
1st Coat Paint by using HEMPEL
1st Coat Paint by using HEMPEL
1st Coat Paint by using HEMPEL
2nd Coat Paint by using HEMPEL
2nd Coat Paint by using HEMPEL
2nd Coat Paint by using HEMPEL
After paint and polish
After Paint and Polish
During Paint of Black Stripes
During Paint of Black Stripes
FINISHED after Paint & Polish & Stripes